In order to reduce costs for the construction of the Community Arts Centre, a list of park needs will be placed on this website. Periodically, we will update this list. All donations will receive a charitable tax receipt and recognition in the park. Your help is be greatly appreciated.

Contacts:

Carman Donato (613 473 4149)
Chris Magwood (613 473 1718)

List of Materials

1.         Digging/trenching: we'll need 3-4 days of excavation time. We need a machine with a 24" bucket for the type of foundation we're doing. We need the foundation trench done, plus trenching for electrical, plumbing and the geo-thermal heating. It can all be done at once so we don't have to keep calling somebody back multiple times.

2.         Aggregate:        40 cu yards of 3-inch minus stone

                                    130 cu yards of sand/gravel fill

                                    40 cu yards of clay soil (10-50% clay content, minimal stone)

                                    40 cu yards of rough brick sand (1/4-inch minus)

                                    16 cu yards of washed 3/4-inch stone

                                    12 cu yards of B-gravel

3.         Approx. 1500 square feet of galvanized steel roofing (dimensions avail. when plans finished)

 